SERVICE
Design and Construction
Test Drive
- It is the process to drive in advance to check if each machinery is normally operated and is suitable for the installation purpose in order for the newly installed treatment system to demonstrate its performance regulated in the design normally.
Comprehensive Test Drive Outline
- For the optimum condition of the treatment plant to fit the installation purpose, the comprehensive test drive inspects to check a normal operation of each machinery to demonstrate the performance regulated in the design of newly installed treatment system and to draw operation factors for normal treatment.
Basic Plan for Comprehensive Test Drive
- Identify the operation condition of facility for each unit process & check each function as a general plant
- Establish efficient process management & control system for an operator of the treatment plant
- Secure the performance of smooth maintenance after the initiation of a normal operation
- Hand over the facilities systematically to the operator of the plant & transfer the operation technique of advanced treatment
- Review of various design factors additionally and check treatment performance to satisfy the quality of discharged water